Planning and ordering
Product selections, site measurements, contractor scheduling, and permit requirements may occur well before demolition.
Construction stages
After removal and inspection, the installer prepares the plumbing and support, fits the solid-surface pan and waterproof substrate, installs the wall panels, then finishes the fixtures and checks drainage and seals.
Why projects take longer
EverSafe reports that most of its walk-in conversions take about two days on site. Confirm your own schedule in writing. Plumbing moves, moisture damage, inspections and separate glass fabrication can add time.