Shower Installation Timeline

Installation duration depends on the condition of the existing bathroom and the scope of the new shower.

Planning and ordering

Product selections, site measurements, contractor scheduling, and permit requirements may occur well before demolition.

Construction stages

After removal and inspection, the installer prepares the plumbing and support, fits the solid-surface pan and waterproof substrate, installs the wall panels, then finishes the fixtures and checks drainage and seals.

Why projects take longer

EverSafe reports that most of its walk-in conversions take about two days on site. Confirm your own schedule in writing. Plumbing moves, moisture damage, inspections and separate glass fabrication can add time.