Start with the existing bathroom
Measure the tub alcove, doorway, and available clearances. Note where the drain, shower valve, and ventilation are located. Identify any water damage before selecting finishes.
What happens during installation?
After the tub and surround come out, the installer checks the framing, floor and plumbing. The new assembly pairs a pre-sloped, slip-resistant solid-surface pan with a waterproof substrate and large-format wall panels. A handheld shower and backing for future grab bars are part of the conversion scope. Confirm the final layout and selections in your proposal.
Choose the entry and accessories
A low threshold keeps a small step at the entrance. A curbless entry meets the bathroom floor without a raised lip where the layout and drainage allow it. Ask about grab bars, fold-down seating, frameless glass and storage before the walls are closed.
What should you confirm?
Ask the installer to explain the waterproofing system, drainage plan, product warranties, permit responsibilities, and what happens if hidden damage is discovered.